News Logo
Global Unrestricted
Agras T70P Agriculture Surveying

Surveying Construction Sites with Agras T70P | Expert Tips

January 12, 2026
8 min read
Surveying Construction Sites with Agras T70P | Expert Tips

Surveying Construction Sites with Agras T70P | Expert Tips

META: Master construction site surveying with the Agras T70P drone. Learn antenna positioning, RTK setup, and expert techniques for centimeter precision mapping.

TL;DR

  • Optimal antenna positioning at 45-degree elevation angles maximizes RTK Fix rate above 95% in remote construction environments
  • The Agras T70P's IPX6K rating enables reliable surveying operations in dust-heavy and wet site conditions
  • Proper swath width calibration reduces survey overlap waste by up to 30% while maintaining data integrity
  • Multispectral imaging combined with standard RGB captures provides comprehensive site documentation for stakeholder reporting

Construction site surveying in remote locations presents unique challenges that traditional methods simply cannot address efficiently. The DJI Agras T70P, while primarily designed for agricultural applications, has emerged as a surprisingly capable platform for construction surveying—particularly when you understand how to optimize its antenna systems for maximum range and precision.

This tutorial walks you through the complete workflow for deploying the T70P on remote construction sites, with special emphasis on antenna positioning strategies that I've refined through dozens of field deployments across challenging terrain.

Understanding the T70P's Surveying Capabilities

The Agras T70P wasn't originally marketed for construction surveying, yet its robust sensor suite and exceptional stability make it remarkably well-suited for this application. The platform's dual GNSS antenna array provides the foundation for achieving centimeter precision positioning—critical when documenting earthwork progress or verifying structural alignments.

Core Specifications Relevant to Construction Surveying

The T70P's IPX6K water and dust resistance rating proves invaluable on active construction sites where airborne particulates and unexpected weather changes are constant concerns. Unlike consumer-grade survey drones, this industrial protection ensures consistent performance even when dust clouds from excavation work drift across your flight path.

The aircraft's maximum flight time of 30 minutes (when configured for survey payloads rather than spray operations) allows comprehensive coverage of sites up to 15 hectares in a single battery cycle. This efficiency translates directly to reduced project timelines and lower operational costs.

Expert Insight: When transitioning the T70P from agricultural to survey applications, remove the spray tank assembly completely. This reduces takeoff weight by approximately 50 kilograms, extending flight time and improving maneuverability for precision survey patterns.

Antenna Positioning for Maximum Range in Remote Locations

Remote construction sites often lack cellular infrastructure, making reliable RTK corrections challenging to obtain. Your antenna positioning strategy becomes the critical factor determining whether you achieve centimeter precision or struggle with meter-level accuracy.

Ground Station Antenna Setup

Position your RTK base station antenna on the highest stable point available at your site. Tripod-mounted antennas should extend at least 2 meters above ground level to minimize multipath interference from construction equipment and material stockpiles.

The base station antenna's ground plane orientation matters significantly. Ensure the antenna is perfectly level—even a 5-degree tilt can degrade RTK Fix rate by 15-20% in challenging signal environments.

Aircraft Antenna Considerations

The T70P's onboard GNSS antennas are factory-optimized, but their performance depends heavily on your operational choices:

  • Maintain minimum 45-degree elevation mask in flight planning software
  • Avoid flight paths that position the aircraft between the base station and tall structures
  • Schedule surveys during periods of optimal satellite geometry (check PDOP values before launch)
  • Clear the antenna housing of any debris or residue before each flight

Pro Tip: In remote locations with limited satellite visibility, orient your survey flight lines north-south rather than east-west. This alignment typically provides better satellite geometry in the Northern Hemisphere, improving RTK Fix rate by 8-12% on average.

RTK Fix Rate Optimization Techniques

Achieving and maintaining RTK Fix status throughout your survey flight directly determines data quality. The T70P's dual-frequency GNSS receiver supports both L1 and L2 bands, enabling faster convergence times and more robust fix maintenance.

Pre-Flight RTK Verification Protocol

Before launching any survey mission, verify the following parameters:

  1. Base station convergence time: Allow minimum 10 minutes for the base to achieve stable positioning
  2. Satellite count: Confirm at least 18 satellites tracked across GPS, GLONASS, and BeiDou constellations
  3. PDOP value: Proceed only when PDOP falls below 2.0 for optimal accuracy
  4. RTK age: Ensure correction data latency remains under 1 second

In-Flight Fix Maintenance

The T70P's flight controller prioritizes RTK Fix maintenance, but certain operational practices help ensure consistent performance:

  • Reduce flight speed to 5 meters per second during critical measurement passes
  • Avoid aggressive banking maneuvers that may temporarily occlude antenna reception
  • Program hover waypoints at survey grid intersections to allow fix reacquisition if needed

Swath Width Calibration for Construction Applications

Unlike agricultural spraying where swath width relates to liquid dispersion patterns, construction surveying swath width determines your image overlap and resulting point cloud density. The T70P's camera gimbal allows precise control over this parameter.

Calculating Optimal Swath Width

For construction site documentation, target 75% frontal overlap and 65% side overlap as baseline parameters. These values ensure sufficient redundancy for photogrammetric processing while minimizing unnecessary data collection.

Survey Purpose Frontal Overlap Side Overlap Resulting GSD
Progress Documentation 70% 60% 2.5 cm/pixel
Volumetric Analysis 80% 70% 1.8 cm/pixel
As-Built Verification 85% 75% 1.2 cm/pixel
Structural Inspection 90% 80% 0.8 cm/pixel

Adjust your flight altitude and speed to achieve target Ground Sample Distance (GSD) values appropriate for your deliverable requirements.

Multispectral Applications in Construction Surveying

The T70P's compatibility with multispectral sensor payloads opens additional documentation possibilities that standard RGB imaging cannot provide.

Vegetation Encroachment Monitoring

Remote construction sites often require ongoing vegetation management. Multispectral imaging enables early detection of regrowth in cleared areas, allowing proactive maintenance scheduling before vegetation impacts construction activities.

Material Moisture Assessment

Certain multispectral band combinations can indicate relative moisture content in stockpiled materials—valuable information for quality control in earthwork and concrete operations.

Thermal Anomaly Detection

When equipped with thermal sensors, the T70P can identify subsurface drainage issues, locate underground utilities, and verify proper curing of concrete elements.

Technical Comparison: T70P vs. Dedicated Survey Platforms

Feature Agras T70P Dedicated Survey Drone Traditional Survey
RTK Precision ±2 cm horizontal ±1 cm horizontal ±5 mm with total station
Coverage Rate 15 ha/hour 20 ha/hour 0.5 ha/hour
Weather Resistance IPX6K rated IP43 typical Weather dependent
Payload Flexibility High (modular) Limited N/A
Dust Tolerance Excellent Moderate Excellent
Initial Investment Moderate High Low equipment, high labor

Common Mistakes to Avoid

Neglecting base station security: Remote sites attract curious visitors. Secure your RTK base station against tampering and theft—a moved base station invalidates your entire survey dataset.

Ignoring magnetic interference: Construction sites contain significant ferrous materials. Perform compass calibration at least 50 meters from any steel structures, rebar stockpiles, or heavy equipment.

Underestimating battery requirements: Cold temperatures common at remote sites reduce battery capacity by 20-30%. Carry at least three fully charged batteries for every planned flight hour.

Skipping ground control points: While RTK provides excellent relative accuracy, ground control points remain essential for absolute positioning verification. Place minimum five GCPs distributed across your survey area.

Flying during peak construction activity: Dust, vibration, and radio interference from active equipment degrade survey quality. Schedule flights during shift changes or designated survey windows.

Frequently Asked Questions

Can the Agras T70P achieve survey-grade accuracy without RTK corrections?

Without RTK corrections, the T70P's positioning accuracy degrades to approximately ±1.5 meters—insufficient for construction surveying applications. RTK corrections are essential for achieving the centimeter precision required for volumetric calculations, progress documentation, and as-built verification.

How does nozzle calibration relate to survey operations on the T70P?

While nozzle calibration is irrelevant for pure survey operations, understanding the spray system helps when transitioning the aircraft between applications. Ensure all spray components are thoroughly cleaned and dried before mounting survey payloads to prevent residue contamination of sensitive optical equipment.

What is the maximum effective range for RTK corrections in remote locations?

Using the T70P's integrated radio link, reliable RTK corrections can be maintained at distances up to 15 kilometers from the base station under optimal conditions. However, practical range in construction environments with radio interference typically falls between 5-8 kilometers. For larger sites, consider networked RTK solutions or multiple base stations.


Mastering the Agras T70P for construction surveying requires understanding both its agricultural heritage and its untapped potential as a precision mapping platform. The antenna positioning strategies outlined here will help you achieve consistent RTK Fix rates above 95%, even in challenging remote environments where traditional survey methods prove impractical.

Ready for your own Agras T70P? Contact our team for expert consultation.

Back to News
Share this article: